Product Details:
|
Name: | Air Shower Tunnel | Material: | Entirety SUS304(T=1.0mm) |
---|---|---|---|
Control System: | Touchable Screen Display Board For Walking Induction Control | Blowing Way: | 3 Direction Blowing |
HEPA Filter: | Mini-pleats HEPA Air Filter | HEPA Efficiency: | 99.995%@0.3um |
Power: | 380V/50HZ 3 Phase | Application: | Cleanroom Operations |
Highlight: | air shower system,electronics clean room |
Custom Tunnel Three Side Blowing Air Shower Room With Walking Induction Control System
Air shower tunnel for Cleanroom Operations:
Airshowertunnel's air shower system is a perfect solution for cleanroom operations, ensuring that people and products entering the cleanroom are free of dust and other contaminants.
Quicky detail :
External Size: 1300x3000x2200mm
Internal size : 800X2930X2000mm
The door open in 90 degree
HEPA filter efficiency: 99.95%@0.3um
Blower way: three diectional blowing
Air speed :>25m/s
Power: 380V/50HZ , 380V/60HZ.
Operating features :
1 : Microelectronics control system with LED display for the shower time.
2: the air shower duration time adjustable from 0-99second.
3: Infrared ray inductor for inside personal shower automatic from three side
4: Human being voice remind of user progress in chamber.
5: Emergency switch help you out of trouble, Comply with CE Test
6: Infrared sensors the person at the entrance door, Then blowers begin working in sequence automatic.
(3pcs infrared sensors along the tunnel)
7: Three side with blow. Emergency stop button for all emergencies.
8: Distinctive automatic cooling system for each blower,It verified the blower can work in long time
without any problem
9:Overload protection system, short-circuit protection system.
Parameter:
KEL-AS3000T3L Air Shower Tunnel |
||
MODEL |
KEL-AS3000T3L |
|
External size (mm) (WXDXH) |
1300x3000x2200mm |
|
Work zone (mm) (WXDXH) |
800x2930x2000mm |
|
Persons per cycle |
3-6 personal |
|
Air shower Duration |
Factory set at 12 second (adjustable) |
|
Air shower direction |
Three side with blowing |
|
Material (Option) |
1: Entirety Sus304. 2: Entirety sus201. 3: External is steel with power coated, Internal is SUS304. 4: External is steel with power coated. Internal is SUS201. 5: color steel panel . (t=50mm) |
|
Control system |
1: microelectrionic control system with LED display for the shower time. 2: The shower time from 0-99second. (Adjustable). 3: Infrared ray inductor for inside personal shower automatic. 4: Human voice prompt system. 5: with CE remark. |
|
The power of Fan |
380V/50HZ/750W (10 set) |
|
Air flow of fan(m3/h) |
1300m3/h |
|
Fan run (r/min) |
2800r/min |
|
Nozzle in stain less steel |
48 pcs |
|
Wind speed(m/s) |
23-29m/s |
|
Noise level(dB) |
<62dB |
|
LED Fluorescent Lamp |
20wx6 |
|
HEPA Filter |
Size(mm) |
630X630X69mm |
Efficiency |
99.99%@0.3um |
|
Air velocity |
1000(m3/h) |
|
Initial resistance(pa) |
<220pa |
|
Pre-filter |
Size(mm) |
775x380x17 |
Efficiency |
75% @ 0.5um |
|
Resistance(pa) |
<30 Pa |
|
Electrical |
Power supply |
380v/50Hz |
Net power(kw) |
0.75X10 kw |
Customer’s design is available.
Applications:
Electronic/ microelectronics/ precision electronic/ biological manufacturing industry/ medical
industry/ food processing/ ITO mode/ liquid crystal and conductive photoelectric suggests
that the industry/ PCB/ SMT manufacturing industry/ aerospacevoyage/ aumomobie manufacturing
industry/ dust-free painting industry and other industry,
Introduce :
Air shower tunnel not only plays an important role in supporting purification of personnel
and things, air shower tunnel can remove personal or components' surface dust for the
operating personnel to enter the clean work environment, but also plays the role
of air brake to prevent not-yet-cleaned air from entering clean area as to ensure a
clean local environment, further to ensure the reliability of the product running
environment and the rate of finished products with good results.
Factory test:
All of equipment is individually factory tested for safety and performance
in accordance with international Standards. Each unit is shipped with a documentation outlining the tests undertaken and the units individual results for each unit.
Factory test include:
-- functional test and visual inspection
-- electrical safety tests
-- air velocity testing
-- purification rank test (if need)
Warranty:
Our equipment is warranty for 1 year excluding consumable parts and accessories.
All equipment is shipped with a comprehensive use’s manual complete with a report documenting all test procedures.
Additional IO/OQ/GMP document is available upon request.
Contact our sales representative for specific warranty details or document request.
Consumable parts illustration:
1: Pre-filter: each one should be replacement in each 6 month, but it can refresh no more three times.
2: HEPA filter: each one should be replacement in each half and one years.
Why you choose K-LING Company ?
Professional sales:
• We value every inquiry that you sent to us, ensure quick competitive offer.
• We cooperate with customer to bid tenders. Provide all necessory docuement.
• We are a sales team, with all techinical support from engineer team
Punctual delivery time:
• Production / inspection report provide before shipment
• Shipping notice or insurance for you when your goods is shipped.
After sales service:
• We respect your feed back after receive the goods.
• We provide one year warranty after goods arrive.
• We promise all spare parts available in lifetime use.
• We care of your complain within 48hours.
Payment Term:
T/T in advance, 30% before place the order, 70% when you see copy BL
Or 30% T/T in advance before place the order, 70% LC at sight.
Contact Person: Mrs. Zhao
Tel: 86 20 13378693703
Fax: 86-20-31213735