Product Details:
Payment & Shipping Terms:
|
Size:: | 1400*1000*2310 Mm | Brand Name:: | KEL |
---|---|---|---|
Weight:: | 350 Kg | Nozzle:: | 12pcs |
Noise:: | 65 DB | Material:: | Powder Coated Steel / SUS304 |
High Light: | semiconductor clean room,lab clean room |
Pharmaceutical Factory Cleanroom Air Shower Vertical Flow For Single Person
Features:
1.Good effect of dust removal
KEL's practical air shower, one-way air flow organization to keep the air velocity consistent, dust removal effect is very good.
2.Return air from bottom, conform to the laws of physics
The way of return air from bottom, dust directly falling as per their own natural gravity. Top of the high-speed wind blowing likes the piston movement, can take the dust away quickly by the bottom elevated floor.
3.High performance fan
Single air shower with 16nos nozzles, built-in high performance fan with wind speed 25m/s or more, resulting in high-speed airflow, forming a vertical one-way bottom return air circulation system.
4.Customized Support
As per the layout of your clean room and your requirements, we can customize the specifications and shape of the air shower.
5.The high-speed wind comes from the top blowing
It can take the dust away quickly by the bottom elevated floor. Basically eliminate the whirlpool and dust raise, can ma*imum guarantee the blowing dust effect.
Structure and Composition
The shower room itself is constructed from high-grade stainless steel, which is resistant to rust and corrosion. The interior is equipped with nozzles or a group of nozzles that spray air particles to form a strong wind shower. The floors and ceilings are coated with anti-static floors, whereas the doors are designed to avoid any direct contact. The unit is equipped with LED lights to ensure maximum lighting conditions.
Design Principles
Airshower tunnel is designed to minimize turbulence, prevent particle re-entrainment, and optimize the highest airflow quality. The structure of the tunnel is designed in such a way that the airflow gets between person’s layers of clothing to capture and remove any particles that may be present on the surface.
Materials Requirements
The Airshower Tunnel is constructed with high-quality materials to ensure durability and corrosion resistance. The most critical parts include the exterior and interior walls, which are made of high-grade stainless steel. The remaining components are usually comprised of high-quality cold-rolled steel sheets that are wear-resistant and maintenance-free.
Parameter :
KEL-AS2000P-2 Series | |||
Model | KEL-AS2000P-2 | ||
External size(mm) (WXDXH) | 2000x2000x2180 | ||
Work zone (mm)(WXDXH) | 1500x1930x1910 | ||
Persons per cycle | 4 -8person | ||
Air shower Duration | Factory set at 12 second (adjustable) | ||
Material | Steel with white color epoxy power-coated or Stainless steel | ||
Fan consumption | 0.75KWX4sets | ||
Air flow of fan(m3/h) | 1300m3/h | ||
Fan run (r/min) | 2800r/min | ||
Nozzle in stain less steel | 40pcs | ||
Wind speed(m/s) | > 22-27m/s | ||
Noise level(dB) | <62dB | ||
LED Fluorescent Lamp | 20wx2 | ||
HEPA Filter |
Size(mm) | 630X630X69mm | |
Efficiency | 99.99%@0.3um | ||
Air velocity | 1000(m3/h) | ||
Resistance | <220pa | ||
Pre-filter |
Size(mm) | 785x385x21 | |
Efficiency | 75% @ 5um | ||
Resistance | <30 Pa | ||
Electrical | Power supply | 380v/50Hz |
Detail
Company advantage
1.Specialized in air purifying&filtration field more than ten years.
2.4000 Square meterISO 8 class clean room workshop
3.The most advanced production&detection equipment and technology/quality guarantee and competitive price
4.Professional R&D team/More than 100 patents/Customized design is available
5.Fast delivery: 5 to 25 days lead time as per order quantity
6.Excellent service system to reassure customers
Contact Person: carol LI
Fax: 86-20-31213735